Our Projects
Rebel Crossroads – Casula
Civiltrak Sydney were engaged by Total Constructions to assist with the Extension of Lot 203 – Rebel at Crossroads Homemaker Centre. The works on this multi-stage project consisted of: Scope of Works: Structural Demolition of existing warehouse, including propping and brace system Site Clearance Remediation Minor Bulk Excavation Detail Excavation Subgrade Preparation Basecourse Preparation Asphalt …
2 Wolseley Road, Darling Point – Bay State Constructions Pty Ltd
Civiltrak Sydney were engaged by Bay State Constructions Pty Ltd on this residential development
Scope of Works:
- Demolition of existing residential structure
- Bulk Excavation – 3,000m3
- Preparing for shoring works
- Detail Excavation
7 Loftus & 37-38 New Beach Road, Darling Point – Bay State Constructions Pty Ltd
Civiltrak Sydney were engaged by Bay State Constructions Pty Ltd on this residential development
Scope of Works:
- Demolition of existing residential structure
- Bulk Excavation – 2,500m3
- Bulk Excavation of neighbouring property – 1,000m3
- Preparing for shoring works
- Detail Excavation
108 Herring Road, Marsfield – John Lyng Commercial Builders Pty Ltd
Civiltrak Sydney were engaged by John Lyng Commercial Builders Pty Ltd on this $50m commercial development.
Scope of Works:
- Demolition and removal of existing liquor shop
- Demolition and removal of existing carpark
- Bulk Excavation – 10,000m3
- Detail Excavation
- Re Classification and removal of ENM material
150 Mowbray Road & 670-680 Willoughby Road, Willoughby – Ceerose Pty Ltd
Civiltrak Sydney were engaged by Ceerose Pty Ltd on this $95m mixed used development comprising 110 residential apartments, bulky goods retail & commercial floorspace.
Scope of Works:
- Demolition and removal of 2x 3 Storey commerical buildings including basements
- Handling of asbestos
- Temporary propping of existing basement and retain
- Underpinning
84-86 Kiora Road, Miranda – CBS Projects Pty Ltd
Civiltrak Sydney were engaged by CBS Project on this mixed used development
Scope of Works:
- Demolition and removal of existing shop front
- Handling of asbestos
- Bulk Excavation (15m Depth)
- Detail Excavation
- Shoring Works (Piling, Shotcrete & Anchoring)
Westconnex M4E – CPB Samsung John Holland Joint Venture
Civiltrak Sydneyhave been engaged by CPB Samsung John Holland JV on this $3.8b redevelopment of one of Sydney’s major road.
Scope of Works:
- Excavation Works
- Testing and classification of materials
- Loading and disposal of materials
- Handling of contaminated materials
Westconnex M5 – CPB Dragados Samsung Joint Venture
Civiltrak Sydney have been engaged by CPB Dragados Samsung JV on this $4.3b redevelopment of one of Sydney’s major roads.
Scope of Works:
- Excavation Works
- Testing and classification of materials
- Loading and disposal of materials
- Handling of contaminated materials
56-60 Burwood Rd, Burwood – Conquest Group
Civiltrak Sydney were engaged by Conquest Group on this residential development
Scope of Works:
- Demolition and removal of tyre shop
- Bulk Excavation – 10,500m3
- Preparing for shoring works
- Detail Excavation
222 Pacific Highway, Crows Nest
Civiltrak Sydney were engaged by PCH Construction Pty Ltd on this mixed uses development
Scope of Works:
- Demolition and removal of existing commercial building
- Demolition and removal of existing basement
222 – 238 Parramatta Road, Homebush
Civiltrak Sydney were engaged by Reitsma Construction Pty Ltd on this development for Sydney Markets
Scope of Works:
- Bulk Excavation – 10,000m3
- Detail Excavation
3 East Crescent St, McMahons Point
Civiltrak Sydney were engaged by ZS Construction on this residential development which comprised of a 4 level basement car parking
Scope of Works
- Demolition of 3 storey boarding house
- Bulk Excavation – 12,000m3
- Detail Excavation
3-5 Milray Street, Lindfield
Civiltrak Sydney were engaged by Poly Global on this residential development
Scope of Works:
- Demolition of 4 x Double Storey Dwellings
- Site Clearance – 5,000m2
- Bulk Excavation – 14,000m3
- Re design and construction of Shoring System (Piling, Capping Beam, Shotcrete & Anchoring)
- Detail Excavation
25-29 Epping Road, Macquarie Park – LOT 104
Civiltrak Sydney were engaged by Greenland Australia on this mixed use development which comprises of 3 level basement car parking, 8 residential building comprising 885 units
Scope of Works:
- Site Clearance – 10,500m2
- Bulk Excavation – 92,000m3
- Shoring Works (Piling, Capping Beam, Shotcrete & Anchoring)
- Detail Excavation
- Subgrade Preparation
697-701 Pittwater Road, Deewhy
Civiltrak Sydney were engaged by St Bernard Construction on this residential development which comprised of a 3 level basement car parking
Scope of Works
- Bulk Excavation – 20,000m3
- Detail Excavation
- Sheet Piling
What clients say about us
Highest level of professionalism
SEG have shown the highest level of professionalism from the very beginning. Completing work on time and with minimal disruption to surrounding residents, the team has been thorough and efficient throughout the entire excavation process. Any concerns raised throughout the process were addressed and rectified without any further issue.
Thank you to Joseph Ishac and team for making the process quick, easy and pain free.
Simon Blout
Remarkable Job
SEG did a remarkable job at Lachlan’s Line and were very adaptive to client-driven design changes. Very easy to work with.
Steve Karam